- 2024-05-03武汉徐东居佳伴
Because of the contract drawings ,gypsum boards of the bathroom and coffee room is
difficult to deal with water issues and wall tiles problems , so we discuss all the problems and decide to replace the gypsum boards with the CMU wall.
赞130